ENGR. ALBERTO S. ORBETA

A licensed Civil Engineer with an extensive (27) twenty seven years of working experience in Multi-Disciplined Engineering works (Oil & Gas, Onshore/Offshore and Infrastructure Construction Projects) plus a knowledge in computer software applications such as MS PROJECT, PRIMAVERA P3/P5/P6,SAP, AUTOCAD,MACROMEDIA & Website Development; Flour Daniel’s working softwares: MileMarker, ProArc, CompleteIT etc.

OBJECTIVES:
Establish and manage effectively a planning and progress control system in order to support the Project Managers decision-making process and allow him to complete the project according to the internal baselines and in compliance with the contractual dates and requirements. Ensure any deviation from plan is promptly spotted and analyzed, final time impact is estimated and the effect of corrective actions taken is monitored. Create a schedule awareness atmosphere among all project participiants.

WORK EXPERIENCE:

September 2011 – Present

Newcrest Mining Ltd.

MOPU Project – Lihir

20 Hudson Rd | Albion

Brisbane, Queensland 4010 | Australia

PRINCIPAL PROJECT CONTROLS SPECIALIST

April 26, 2010 to January 17, 2011

Fluor China

No.518 – 519
Lido Courts, Holiday Inn Lido Beijing

PRINCIPAL PROJECT CONTROLS SPECIALIST

As Lead Planner for the Oyu Tolgoi Mongolia Mining (Infrastructure) project using Primavera P6

Responsible for developing the PMC Infrastructure baseline accelerated schedule

Evaluates Bidders level III schedule

Ensure that Integrated schedule is properly resources loaded

Preparation of Progress Measurement Sheet , Manpower Histograms, S-curves

Jan. 07, 2008 to March 28, 2010

Marathon E.G. Production Limited
P.O. Box 742, Malabo
Equatorial Guinea
Tel.No. +12819942217
Marathon Oil
Equatorial Guinea

SENIOR PROJECT CONTROLS SPECIALIST – PLANNING

Construct and review EPC master schedule for Offshore and Onshore (including all milestones) using CPM techniques coordination with project manager and junior planners
Review and incorporate contractors (Design & Build) schedules into the master schedule.
Ensure that Master schedule is properly resources loaded
Follow up and monitor all construction activities (Civil works,steel structure installation works,Mechanical and electrical equipment installations, marine works) and conduct frequent visits to sites in order to guarantee work is done as planned schedule and quality
Attend project coordination meetings and progress meetings as a client representative

March 10, 2006 – October 31, 2007
Parsons Flour Daniel International
Tengizchevroil – SGP/SGI Projects
Republic of Kazakhstan

PLANNER
Responsible for developing and maintaining baseline and statused Level III schedule as
per established project procedures and methodologies. Reviews and forecasts contractor
workfront availability and coordinates with field engineering and material groups to ensure
problems are identified to Project Management for further action. Responsible for compilation
of weekly status report.
As Turnover Planner responsible for the preparation of Offsites Custody Transfer
Plan (Turnover/Commissioning).
Project value: US $ 5,000,000,000.00

December 27, 2004 – December 23, 2005
Saipem Contracting Nigeria Limited
SCNL Yard- Port Harcourt
Rivers State, Nigeria
Tel. +234 84 575678

SENIOR PLANNING ENGINEER
Responsible for preparation of EPC (Engineering, Procurement & Construction) Schedule, Resource, Network Diagrams, Updating Forecasting Cashflow Diagrams, Comparison to Targets with Current Schedule and forecasting Tracking Critical Path. Organizing Sequencing Activities using PRIMAVERA P3 for the Elf Petroleum Nigeria Ltd / SaiBOS – Amenam 2 EPC offshore project, ERHA Project EPC1 FPSO & YOHO B EPC2 PROJECT (Exxon Mobil as Client)
Responsible for the preparation of Project Productivity Report
Resposible for updating weekly and Monthly Progress Report
Responsible for the updating of Reports in the intranet
Preparation of Progress Measurement Sheet , Manpower Histograms, S-curves
Participate in Staff meetings and conferences.

March 27,2003 – October 29,2004
Saudi Archirodon Ltd.
P.O.Box 2987, Jeddah 21461
Kingdom of Saudi Arabia
Tel. (+966-2)635-2244

SENIOR PLANNING ENGINEER
Worked with ALMACON (Partner of SAUDI ARCHIRODON LTD.) for the Seawater Cooling System Expansion Project in Yanbu, Saudi Arabia as Planning engineer from March 27,2003 up to November 3,2003. Project Value: US $ 66,266,000
Responsible for preparation of Bar Charts, Resource, Network Diagrams, Updating Forecasting Cashflow Diagrams, Comparison to Targets with Current Schedule and forecasting Tracking Critical Path and Monthly Reports organizing Sequencing Activities using PRIMAVERA P3 for Shoaiba Steam power plant (5X350MW) Stage 2 Phase 1 & 2 project in consortium with ABB (Alstom Power) at Shoaiba Jeddah, Saudi Arabia. Project Value: US $ 181,581,000
Responsible for the development of planning department website thru the intranet.

June 17,2002 – Nov.25, 2002
NESIC PHILIPPINES INC.
15th Floor, BPI Buendia Center
Sen. Gil Puyat Avenue, Makati City

PROJECT ENGINEER
Supervision of subcontractor’s construction operation for the ATO / DOTC Nationwide Air Navigation Facilities Modernization Project Phase III
Coordinate with all parties involved in the construction regarding the design, implementation and safety procedure.
Preparation of implementation construction program using PRIMAVERA P3
Close monitoring and checking progress schedule.
Participate in Staff meetings and conferences.

July 9,2001- June 15,2002
STA. CLARA INTERNATIONAL CORPORATION
CP-CBK HYDROPOWER PROJECT
Brgy.Lewin, Lumban, Laguna, Philippines
Tel. Nos.: (049) 8080854

SENIOR PLANNING / COST ENGINEER
Preparation and Monitoring of construction schedule using PRIMAVERA P3
Reviewing and evaluation of budgetary cost estimates, Inspection of client construction sites, construction cost analysis, cost reporting and monthly progress report.

July 26,1999 – January 31,2000
JOHN HOLLAND JOINT VENTURES SUBIC INC.
SHELL PHIL. NATURAL GAS PROJECT
MALAMPAYA CGS ALLIANCE
CONSTRUCTION / REBAR DEPARTMENT
Bldg. 664 Waterfront Road Subic Bay
Freeport Zone, Olongapo City

SENIOR ENGINEER
Check and provide allied field engineers of the Malampaya concrete gravity substructure (1st in Asia and 3rd in the world) with updated drawings, masterlist and bending schedule.
Coordinate closely with the document control and planning section with regards to any design changes or contradiction in the plans.
Provide the Reinforcing Superintendent with all the updated plans and documents.

December 1,1998 – June 30,1999
KHALID CONSORTIUM
UNIT 7 & 8, 2nd FLOOR, BLOCK D, KIARONG COMPLEX, LEBUHRAYA, SULTAN HASSANAL BOLKIAH, NEGARA BRUNEI DARUSALLAM

SITE SUPERVISOR / QUALITY CONTROL ENGINEER
Supervision and Quality control of subcontractors construction activities in the implementation of “Optical Transport and Access Network Infrastructural Work” project for the 20th South East Asian Games and Trans-borneo Communication ring in Brunei Darusallam undertaken by Lucent Technology (Works involved are construction and installation of pre-casted manholes, excavation and trenching works, installation and concrete encasement of ducts, restoration and repair of affected road pavement, underground directional boring on all road crossings, reconstruction of selected exchange buildings and installation of fiber optic cables.
Coordinate with concerned government agencies regarding the construction operation in their area of jurisdiction.
Conduct acceptance testing for the turnover and commissioning of the project.

April 16, 1997 to October 20, 1998
NEC System Integration and Construction Ltd.,
(Implementation Department)
4th & 5th floor, Emmanuel House Bldg.
115 Aguirre Street, Legaspi Village,
Makati City, Philippines

SUPERVISOR
Supervision of subcontractors construction operation for the (underground and overhead) telecommunication project in line with the implementation of 300 thousand lines “Digital Telecommunication” project for region I, II, III, IV and V.
Coordinate with all parties involved in the construction regarding the design, right of ways, implementation and safety procedure.
Preparation of implementation construction program using MS PROJECT / PRIMAVERA P3
Close monitoring and checking progress schedule.
Participate in Staff meetings and conferences

May 1, 1996 to April 15, 1997
Nesic Telecom Construction Phil. Corp.
(Construction Department)
4th & 5thFLOOR, Emmanuel House Bldg.
115 Aguirre Street, Legaspi Village, Makati City, Philippines

(May 1,1996 – April 15,1997)
SUPERVISOR

(April 1,1995 – April 30,1996)
ENGINEER

Design and supervision of Outside Plant telecommunications projects in adherence to engineering standards and practices.
March 1994 to March 1995
NESIC PHILIPPINES INC.
(Communication Facilities Engineering Department)
7th FLOOR, SSS Makati BUILDING
AYALA AVE., cor Herrera St.MAKATI CITY.

ENGINEER
Design of (underground and overhead) project for Angeles City and Balanga Bataan
“Digital Telecommunication” Project

January 1993 to December 20, 1993
SUMITOMO CORPORATION
OUTSIDE PLANT OFFICE
NAGA CITY, PHILIPPINES

SUPERVISOR
Supervision of civil works for outside plant installation of the National Telephone Program (NTP TRANCHE I-1) in Area 4, Region V.
Monitor the progress accomplishment of Sub-Contractors in their respective areas.
Preparation / Control the implementation schedule of Sub-Contractors using MS PROJECT.

August 1991 to December 1992
JJM CONSTRUCTION
NAGA CITY, PHILIPPINES

PROJECT ENGINEER
Construction supervision of relay stations, towers, concrete roads and other related engineering works.
Prepares plans, estimates, shop drawings, bill of quantities, daily progress reports and quantity take-off.
Responsible for the preparation of tender documents for biddings.
Prepares PERT/CPM and check the construction methodology whether it conforms to the plans and specifications provided for.

March 1990 to June 1991
DEPARTMENT OF PUBLIC WORKS/ HIGHWAYS
IRP-ADB (INFRASTRUCTURE RESTORATION PROGRAM – ASIAN DEVELOPMENT BANK
2ND ENGINEERING DISTRICT, CONCEPTION PEQUENA, NAGA CITY, PHILIPPINES

ENGINEER
As engineer in charge of roads and bridges.
Do actual inspection and supervision of IRP-ADB FUNDED projects.
Conducts site visit and inspection of concrete, asphalt and gravel roads, docking facilities, bailey and reinforced concrete deck girder bridges.
Prepares program of works and render close supervision on the project, seeing to it that works are in accordance with the plans and specifications.
Encourage contractors to submit timely updates.
Coordinate with allied Field Engineers and Designers regarding electrical, structural, and architectural aspect.
Evaluate and keep records the progress and accomplishment of contractors.
Submit weekly and monthly progress report.

June 1990 to March 1992
VALIENTE INSTITUTE OF TECHNOLOGY
CONCEPTION PEQUENA, NAGA CITY

INSTRUCTOR
As an instructor in Antenna Fundamentals, Communication Equipment, Algebra & Trigonometry

December 1985 to December 1989
GODEST CONSTRUCTION COMPANY INC.
NAGA CITY, PHILIPPINES
(December 1988 – December 1989)

PROJECT SUPERVISOR
Construction supervision of concrete roads, levee and other related engineering works.
Prepare bill of materials and quantity take-off.
Prepares and implements construction program.

(November 1986 to November 1988)

PROJECT ENGINEER
Construction supervision of residential and school buildings, concrete and gravel roads.
Assign duties and tasks to Foreman and Leadmen of each respective crew.
Prepares plans, bill of materials, bar charts, shop drawings and network diagrams of every project.
(Structural analysis and design of various residential buildings.)

(January 1985 to October 1986)
CIVIL ENGINEER AIDE
Draft and design schematic and construction drawings of residential and commercial buildings.
Assist in the construction supervision of various secondary school buildings including provincial and municipal roads.

TRAININGS, SEMINARS ATTENDED:

1. Theory and Applications of PERT/CPM
Philippines Institute of Civil Engineers
Date Attended: February 9, 1990
Place: University of Nueva Caceres

2. Hydraulic Design of open channels
Philippines Institute of Civil Engineers
Date Attended: February 10, 1990
Place: University of Nueva Caceres

3. Pre-stressed Concrete Design
Philippines Institute of Civil Engineers
Date Attended: February 10, 1990
Place: University of Nueva Caceres

4. Basic OSP Engineering
Nesic Telecom Const.Phil. Corp
Date Attended: July 15 to 21, 1996

5. Basic Jointing and Testing Copper
and Fiber Optic Cable
Nesic Telecom Const. Phil. Corp.
Date Attended: July 15 to 21,1996

6. Site Planning for Civil Engineers
Philippine Institute of Civil Engineers
Date Attended: February 26 to 28,1998
Place: De La Salle University Phil.

7. IIF (Incident & Injury Free) Training
Parsons Fluor Daniel
Date Attended: March 11-12, 2006
Place: Tengiz, Republic of Kazakhstan

8. CompleteIT Basic User Course
Fluor Corporation
Place: Tengiz, Kazakhstan 18 Dec.2006

9. Billy Pugh Offshore Training
Marathon oil
Date Attended: Jan.10, 2008
Place: MEGPL Equatorial Guinea

10. STOP Training (Safety Training Observation Program)
Marathon oil
Place: MEGPL Equatorial Guinea

EDUCATIONAL BACKGROUND:
COLLEGE: UNIVERSITY OF NUEVA CACERES
Naga City
Bachelor of Science in Civil Engineering
1982 – 1986
HIGH SCHOOL: UNIVERSITY OF NUEVA CACERES
Naga City
1977 – 1981
ELEMENTARY: NAGA PAROCHIAL SCHOOL
Naga City
1971 – 1977

COMPUTER BACKGROUND:

MICROSOFT WORD / EXCEL/ ACCESS / POWER POINT / FRONTPAGE, AUTOCAD, MS PROJECT, PRIMAVERA P3 / P5 / P6, MACROMEDIA, FLOUR DANIEL’S WORKING SOFTWARES; MILEMARKER & PROARC, COMPLETEIT, WEB DESIGN & WINDOWS TROUBLE SHOOTING

GOVERNMENT EXAMINATION TAKEN:

Civil Engineer Licensure Exam. – PASSED (Date taken: Nov. 1988)

MEMBERSHIP:

MIEPNG – Member Institute of Engineers Papua New Guinea
PHILIPPINES INSTITUTE OF CIVIL ENGINEERS